The construction of any building begins with the construction of the foundation. One of the most common bases today is the strip monolithic foundation. Its construction occurs in several stages, each of which must be strictly observed.
In general, the construction of the foundation of this type is easy. First you need to clear the construction site and outline the boundaries of future trenches. Trench should dig at least 1.7 m. After the trenches are dug up, you need to put on their bottom, the so-called pillow-layer of sand or a mixture of sand with gravel. The pillow should be embroidered in stages. Each poured layer must be triggered and shed with water. It is very important to ensure that these layers do not exceed a thickness of 0.5 m. After the pillow is tamped, you can start mounting the frame from iron rods.
The next is the concrete stage. For the foundation to cost cheaper, it is better to buy cement wholesale, as concrete will need a lot. To make it more convenient to pour concrete in a trench, you can use concrete pump.
In order for the foundation to turn out reliable, you need to use only those materials that were supposed during constructive calculations. In the process, every trifle is important, starting from the brand of concrete, ending with the thickness of reinforcing rods. The foundation built using this technology is the simplest option and can only be used for buildings where the basement and basement are not provided. If you need a building with underground rooms, then instead of trenches a deep pit should dig.