When the process of destruction of the foundation occurs, what a way out to find in this situation. Today there are many ways to return the foundation a new life. One of them is the installation of a house on piles. The technology for the reconstruction of the foundation consists of the following processes:
Want to know more about the tolerance, but don’t know where? Here you can find out all the information you are interested in about the deadline.
To a depth of up to two meters around the perimeter of the entire house, screw piles are screwed;
As well as during the construction of a new building, piles are subject to concrete fill, closed with a headstper, tied with a channel.
In the future, the house must be raised with special jacks of 30-40 centimeters for laying metal beams under it.
After laying the beams, all iron structures are necessarily stained with a special composition, extracting jacks, paves waterproofing and the house lowers the whole structure.
All work on the reconstruction of the foundation at small facilities takes at least three days at one team of builders. If the house is relatively large sizes, by 150-200 m2, the reconstruction process can take up to one week. In this case, the piles need to be screwed both around the perimeter and under the house, for this part of the floor is disassembled.