After a certain time of operation of the wooden floor, the floorboards begin to cry out. This means that the fasteners of the floorboards are weakened due to rotten floorboards in the places of touching them with the lags. It’s time to think about replacing the old coating with a new. It is necessary to make it according to all the rules of the installation of floors, insulate and linen.
Looking for a good site on which you can choose the interior design of the cafe? You can visit this site and choose a cafe interior design there.
First, furniture from the repair room is removed. When everything is removed and the floor is free, they begin to dismantle it. The facing material is removed – linoleum, or some other, and the floor boards rise. An audit of beams and boards is carried out for decay and infection with a fungus. If there are at least small hints for this, then you need to change the entire structure. No antiseptic can be taken away.
We select material for the floor. The pitch of stacking beams depends on its thickness – with a board thickness of 40 mm, the step of the beams will be up to 800 mm. Beams before laying should be impregnated with an antiseptic. The place of work is removed from construction debris, and the beams are laid in the intended places. Their installation is carried out strictly in terms of level. In places of drawdown, beams must be leveled with linings. Lining are made of solid wood or plywood, and must be attached to the beam with self -tapping screws.
Mineral wool slabs for insulation are laid between the beams, and the floor is laid. After its cycling, on a flat surface, cladding is laid.