The time for repairs in the summer season is in full swing. Someone decided to thoroughly repair their home, and someone limited himself to cosmetic repairs. Now the “warm floors” lined with tiles, or with a laminate, but still have lovers of wooden floors are very fashionable.
How to put in order a wooden floor? First of all, the floor must be cleaned and let it dry very well. Next, soak the Oliphi (you can in 2 layers). The next stages of floor preparation for painting will be grinding and priming the entire surface, put in order. It is necessary to give a primer to dry – ideally it is a day (24 hours). The color of the primer should coincide with the color of the upper layer of paint – this is important! After the primer dried up well, the floor is again grinded, this time with paper. Then they must remove the resulting dust. After the preparatory stage is completed, they begin to directly apply paint in 1 or 2 layers, if it is an enamel PF-115. But before applying the second layer of oil enamel, it is necessary to postpone until the first layer dries completely (then the paint will not slide, forming the folds).
It is much easier to do with the known nitroamal. It dries much faster than oil, (about 2 hours), as a result of which, painting can be completed in one day. It is necessary to apply nitroemal in 2, or even 3 layers, each time waiting for a hundred percent drying of the previous layer.
They do the same with all wooden stained surfaces, except parquet.