How to correctly calculate the costs of different objects

How to correctly calculate the costs of different objects

Initially, during the construction it was planned that all three buildings would be included in one complex. Thus, all costs were mixed into one. But later, it was decided to divide all three houses and keep records separately. How in this case to divide the costs? How to be if the costs will differ with those on the estimate? The following article will help in such a situation.

Determination of the right methodology.

You need to understand when an error was made. Then, as it was decided to consider all expenses in the complex, or may vice versa, when it was decided to share expenses.

According to the law, the Law of the long -term object is carried out in the complex and for each building separately. In the general account, a sub -account should be provided, which makes it possible to calculate embezzlement for each composite complex separately. Thus. It can be argued that by law it is necessary to keep records for all objects that are included in the complex.

How to determine the construction object?

The construction object is understood as a building that stands regardless of the rest. During the reconstruction or demolition of this building in the future, there must be separate documents. Estimates and the like.

List of design documentation

The composition of the design documentation is indicated in 2008. Thus, the structure of something should be accompanied by the issuance of project documentation. It is also necessary, there must be a estimate for construction work. All parameters of estimated documentation decides and sets the customer.

This means that in some cases, estimates may not be. This option is possible if the construction is in charge of a private organization. All costs are determined by accounting reports on the basis of actual work costs.

Even if the estimate exists, then the costs of the fact and theoretical these estimates may not match. Such cases are considered normal. True, if the difference in indicators is small.

Estimate is a kind of indicator of the amount in which you need to invest. Based on the estimate, the developer decides which materials to buy, where it is better to save, and where you can buy something more expensive.

Also, an estimate is needed for further analysis of the situation in construction and for planning expenses for the next quarter. Thus, that the decision made first that joint expenses should be considered is incorrect. It does not complies with the law and violates the normative acts.