How to correctly make a wiring of copper pipes: what to take into account

How to correctly make a wiring of copper pipes: what to take into account

First of all, the wiring of copper tubes connecting the internal and external blocks is carried out, for which the walls will be drilled and fine. If it is impossible to hide communications into the wall, they put on a plastic box on them. It is important to carefully ensure that there are no creases in the tubes, and also that they are normally broken off. When assuming inaccuracies in installation, subsequently the pipeline may freeze and the power to decrease. In some cases, the installation of air conditioners uses mounting foam.

After communicating, consolidating the internal and external blocks, you can proceed to the installation of the drainage system, the role of which is reduced to the removal of condensed moisture. As a rule, the hose is in the case along with the rest of the communications, and all this is taken to the street. In some cases, its conclusion to the sewage system is possible. As for the power supply, it must be understood that even a low -power air conditioner needs separate wiring, since ordinary apartment wiring may not withstand the load. After conducting an electric cable, they proceed to test the air conditioner. The work test of the entire system is carried out in the test program mode. With proper installation, the device will work stably, without vibration and noise.