How to correctly perform plastering work

How to correctly perform plastering work

Perform plastering work is quite easy. Between the two beacons, a solution is thrown. This execution is called “Outfit”. After the solution has been sketched, it is leveled from the bottom up by the rule that relies on the neighboring beacons.

I want to know for a long time how to carry out the design of the design now, but do not know where to find out this information? You can find out it on this site .

For the plasterer’s outfit, the Falcon is used, it is a flat metal platform that has a handle from below. A solution is applied to such a site for plastering.

On the “Falcon”, impose much more solution than using the trowel. Plasters in one hand holds a falcon, and the other throws a underfloor solution from the falcon to the wall surface. Therefore, labor productivity is ensured, much higher. The solution can be poured as you like, the technology does not require cardinality.

In order to make a layer of plaster thick, first you need to make just a rude tank, without aligning the beacons. After the layer dries and becomes solid, you can proceed to the shallow schedule and level it, as described above.

After waiting until the solution that was applied and stretched through the beacons will dry out, begin to grout it. That is, the surface that was plastered, polished, getting rid of minor defects. This is where the work on the plastering of the walls ends.