Preparing to fill out the seams, prepare the following tools: a tool for putty, hammer, rubber aunt.
We begin to fill the joints, for this we pour a cup of solution on the floor and begin to rub it with a rubber grater, holding it at a 30 degree angle. We fill the seams to the edges, and we check the absence of bumps formed due to air. Remove the excess solution with a grater, increasing the angle of its inclination to 45. Diagonal in the grater, otherwise you can damage the seams, also do not forget to rinse the grater with water.
After using cement dough, wipe the tile with a damp sponge. We do this in circular movements until we achieve the desired result. After the tiles dry, polish it with a soft cloth.
The final hardening occurs after about two weeks. Do not forget to cover the seams filled with testing if the surface of the cladding is in the room with high humidity. Alcohol tiles should also be protected. Always follow the instructions for the preparation and application of the protective composition. If it is said that the solution is suitable only for seams, then it should be cleaned from the surface of the tile until hardened.
At the end of all the work, we put the baseboard in their places and we can say that the styling is over.